2BV Liquid Ring Vacuum Pump Efficient Operation and Maintenance and Installation Guide
                                                        2025-04-22
                                                        When installing 2BV2061, it is necessary to ensure that the base is level, and the shock-absorbing rubber or bolt is poured and fixed, and the pipeline connection shall be made of oil-resistant rubber gasket, and the pipe diameter shall not be less than the suction diameter of the pump body. F
                                                    
						
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    